Click the link below to view the GBID Emergency Response Manual.
Water Conservation Plan
This report by Kerr Wood Leidel completed in 2018 identifies targets and opportunities for sustainable water use in the GBID service area.
Read report GBID Water Conservation Plan
Water System Inspection Report – April 2019
A routine inspection by Vancouver Coastal Health was conducted on March 08, 2018.
See the VCH report April 2019
Gillies Bay Master Water Plan
In 2016 the Gillies Bay Improvement District consulted with Kerr Wood and Leidal Engineering firm, who conducted a 20 year Master Water Plan. Recommended upgrades are given for the areas of :
- Fire Protection
- Water Treatment and Quality
- Life-cycle and Water Loss.
- Water Conservation and Environmental Considerations
- Customer Relations
2012 Long Term Infrastructure Funding Requirements
Based on Asset Replacement Schedules for Gillies Bay Improvement District
Prepared by: AquaVic Water Solutions Inc.
This report is completed as part of a project undertaken during the period December 2011 through June of 2012 with the Gillies Bay Improvement District (GBID or the “District”). The goal of this project was to assist the District in determining long term infrastructure funding requirements for its water service area.
This was accomplished by first developing an asset replacement schedule (ARS) and then identifying a scenario for annual contributions for asset replacement (ACFAR) that supports long term sustainability.
Read the report Long Term Infrastructure Funding Requirements
2012 Funding Infrastructure Renewal for the Long Term
Funding Infrastructure Renewal for the Long Term:
- Asset Replacement Schedule (ARS)
- Annual Contributions for Asset Renewal ($ACFAR)
Follow the link to view the report
GBID 2012 Infrastructure Funding Report
by AquaVic Water Solutions Inc. of Victoria BC